Our New Home travel blog

Cabinets and sinks removed

Modular shower removed

Plummer set up new shower lines

For new shower, wall tile with accent and the floor

New wallboard Hung in kitchen

Ready for plaster

 

Fall is finally in the air


We stayed away over the weekend while a lot of work was done in the demo of the master bathroom. The break was nice as we’ve been hard at it for some time.

The modular shower was removed and ready for new wallboard. The plummer ran the new shower head lines to the the heights we prefer, there will be two shower heads that can be ran separate or both at the same time.

The old sinks were removed as well as the old cabinets. We are in the design stage for new cabinets and will be shopping for new sinks, granite, and faucets.

Monday and today we continued our painting of the closet door and entry door trim. We should finally be finished with all the wood trim with Dover White color by Sunday.

There will be a lot of activity this week with plastering, framing the entertainment area, preparing shower for tiling, and flooring may start in the craft room areas. While all that is going on, Ann and I will be searching for our sinks, faucets, granite, tile for both fireplace surrounds, and new kitchen backsplash.

So much to do and things are moving fast!